Cellular Tower

A tower constructed for or an existing structure that has been adapted for the location of transmission antennae or related equipment to be used in the provision of cellular telecommunications services or personal communications services.

For assistance with development of a commercial project, please contact the Department of Economic Development via info@ecalvert.com.

County Projects

Required Permit Applications and Forms

Requirement More Information Link(s)
Critical Area
Cellular Towers within the Critical Area require a Critical Area Worksheet.
The law identifies "Critical Area" as all lands within 1,000 ft. of the mean high water line of tidal waters, or the landward edge of tidal wetlands, and all waters on (and lands under) the Chesapeake Bay and its tributaries.
Critical Area Worksheet
Building Permit Cellular Tower construction requires a Commercial Building permit. Commercial Building permit
Electrical Permit Cellular Tower electrical work requires an Electrical permit submitted by a licensed master electrician. Electrical permit
Grading Permit
Cellular Towers with soil disturbance of 5,000 square feet or greater AND/OR cut and fill volume total exceeding 100 cubic yards require a Grading permit.
NOTE: Grading permits will require mitigation of stormwater in accordance with MDE. A Declaration of Restrictive Covenants (DoRC) form will be required for county inspection of stormwater devices.
Grading permit
Water Sewer Permit Cellular Towers where the property is served by public water and/or public sewer require a Water Sewer permit. Water Sewer permit

Water Sewer Department webpage
Historic Permit Cellular Towers where the property is a designated Calvert County Historic District require a Historic Area Work permit. Historic Area Work permit, HAWP Instructions
Environmental Health Department Review Properties served by well and/or septic will require an Environmental Health (EH) Department review. Please see item 8 on the attached Building Permit FAQ page for a general list of setback requirements. Percolation testing and/or a Sanitary Construction permit application may be necessary contingent on the property and the proposal.

Please note that by submitting a building permit application our office is granted permission to conduct site visit(s) as necessary at our discretion to facilitate the review of the project. If the proposed structure is external, please stake it out onsite to avoid delays in review time. If you need assistance locating the well and/or septic systems, you may fill out a Public Information Request Form to obtain the property's file.
- Building Permit FAQ

Plan Submittal Requirements

The following information must be submitted with applicable permit application(s):

Other Potential Requirements

Requirement More Information Link
Beach Application Approval IF the property is located in the town limits of Chesapeake Beach or North Beach, a Beach Application Approval is required to be submitted with the Building Permit Package. Chesapeake Beach 

North Beach
Property Owner's Association Approval IF the property has a Property Owner's Association (POA), POA approval may be required prior to construction. Property owners should consult their POA. N/A
Agricultural Preservation Approval
IF the property is located in an Agricultural Preservation District, Agricultural Preservation Advisory Board approval may be required prior to permit issuance.

Use this interactive map to see if you are in the Agricultural Preservation District.
Agricultural Preservation Advisory Board website
County Road Access Bond IF the project is proposing a new entrance onto a county road, a Residential Road Access Bond may be required. The refundable bond is $600. Commercial fees require a cost estimate. N/A
State Road Access IF the project is proposing a new entrance onto a state road, a State Highway Administration (SHA) Entrance Permit is required. Certification of Entrance Approval is required prior to final grading approval. MD SHA Access Permit Application
Forest Conservation/Forest Stand IF clearing of the property is on a lot more than 40,000 sq. ft. in size, a Forest Conservation Worksheet (FC), Forest Stand Delineation (FS), and Forest Conservation Plan are required. An exemption may waive these requirements. FC Worksheet & FS Delineation
Maryland Dept. of the Environment Notice of Intent IF clearing of the property is greater than one acre or involves environmental features governed by Maryland Dept. of the Environment (MDE), a Notice of Intent filed with the MDE is required. MDE website